Renting a Bailey bridge is often more economical than buying when the crossing is temporary. We rent panels, beams, deck plates, bracing and guardrails, with or without erection and dismantling crews.
| Rental item | Notes |
|---|---|
| 321 Bailey panels | Rented by panel / by span, daily rate |
| Bailey beams & deck plates | Sized to span and load class |
| Bracing frames, pins, guardrails | Full accessory set included |
| Steel pipes & props | Scaffold tubes, couplers, steel supports |
| Erection / dismantling | Optional crew, quoted per project |
| Transport | Quoted by distance and load |
Rental cost is usually the sum of: daily panel/beam rate × rental days, transport in and out, erection and dismantling labour, and consumables or site works. Longer rentals reduce the effective daily cost. For a full breakdown with example figures, see our rental cost guide.
Tell us the site, span and load requirement — we survey and propose a solution quickly.